●PRELIMINARY CONSTRUCTION ESTIMATE

How much will it cost to build? A range, not a guess.

Not “area × 1 500 €”. We show the cost range, the biggest drivers behind it and the accuracy level. An estimator prepares the accurate estimate from your documents.

Building use

EARLY CONCEPT

—–—

Biggest cost drivers

    Preliminary cost breakdown

    Accuracy levels
    1. Early concept ±25 %
    2. Preliminary ±15 %
    3. Based on documents ±8 %
    4. Estimator-verified ±4 %
    Is your project ready?

    ?WHY A RANGE

    Why we don’t show a single figure.

    Two buildings of the same size can differ by tens of per cent: ground, structure, facade, building services, finishes and schedule. That’s why the tool shows a range – and accuracy grows with your documents.

    The result is not a proposal or a contract price. Once you upload the technical design and bills of quantities, an estimator will prepare a document-based estimate with scope and exclusions.