REMPOLIAI Build Lab

How a building is built – layer by layer.

Construction progress100%

→BUILDING EXPLORER

Every layer – a stage, a service and a guide.

01PlotScope to be confirmed

Surveying, ground investigation, site fencing, temporary roads and connections. This is where we define how the building will “sit” on its site.

Setting-out certificate, survey control drawing.

Site preparation and landscaping
02FoundationsRempoliai works

Transfers building loads to the ground. The solution depends on geology and the structural design – not on habit.

Reinforcement inspection before pouring, concrete test cubes, hidden works certificates.

New building construction
03Load-bearing structuresRempoliai works

Columns, beams, load-bearing walls – the building’s “skeleton”. Its accuracy sets the pace of every stage that follows.

Survey control of verticality, connection inspections, erection log.

New building construction
04Floor slabsRempoliai works

Horizontal structures between storeys. They tie the frame into a single rigid system.

Flatness measurements, hidden works certificates.

New building construction
05WallsRempoliai works

External and internal walls: thermal performance, sound insulation, fire compartmentation.

Airtight junctions, opening dimensions to design.

New building construction
06RoofRempoliai works

The building becomes weathertight – from here, work inside can continue whatever the weather.

Watertightness check, fall control.

New building construction
07FacadeManaged subcontracting

The building’s outer skin – energy performance and architecture in a single layer.

Insulation fixing inspection, airtightness test (for A++ projects).

New building construction
08Windows / doorsManaged subcontracting

Openings, shopfronts, doors. Airtight installation determines heat loss and acoustics.

Installation junction inspection, sealing tapes.

New building construction
09Building servicesManaged subcontracting

Electrics, water, heating, ventilation, fire safety. Coordinated as one schedule – not as separate contractors.

Pressure tests, insulation resistance measurements, commissioning certificates.

Building services coordination
10Interior finishesScope to be confirmed

Floors, walls, ceilings, doors – the space becomes ready for use.

Snag list with photos before handover.

Interior fit-out
11LandscapingScope to be confirmed

Access roads, car parks, lighting, planting. The last layer – and the first thing visitors see.

As-built survey, completion documents.

Site preparation and landscaping